Welcome to the AD/APC FAST Facility

The mission of the Fermilab Accelerator Science and Technology (FAST) Facility is to develop a fully-equipped R&D accelerator chain intended to support research and development of accelerator technology for the next generation of particle accelerators. The primary focus of this effort is the Integrable Optics Test Accelerator (IOTA) ring, which will be able to accept injection with either of the following:

  • 150 MeV electrons from a photoinjector-based superconducting RF linear accelerator.
  • 2.5 MeV protons (H+) from the IOTA Proton Injector (formerly HINS).

For more on specific projects related to the IOTA injectors and ring, visit the projects portal.

News / Current Status

 
For more visit the FAST elog and Status Archive | 

Fermi National Accelerator Laboratory is operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy

Security, Privacy, Legal